We Do It All, So You Don't Have To.

We design, finance, build, own, operate and maintain each facility–end to end.

We Take the Risk Off Your Plate

For Utilities

  • No capital investment required.
  • No added burden on your operations.
  • Simple onboarding and seamless transition.

For Haulers

  • Additional outlet capacity.
  • A secured tipping partner (no stranded routes).
  • Predictable pricing for your customers.

How We Work Together

Straightforward agreements. Predictable results.

risk-management

Medium-Term (3-5 years)

Flexible, with renewal options.

financial

Long-Term (20+ years)

Stability and pricing certainty.

Sludge-Icon

We Take 100% of Your Sludge

Guaranteed disposal capacity—no backups, no surprises.

Diversification-Icon

Extra Capacity, Zero Risk

Keep routes running with guaranteed outlets and stable pricing.

business-contract

Contract Term

Multi-year agreements that ensure stability and service continuity.

deal

Minimum Guaranteed Volume

Guaranteed minimum tonnage secures operational and financial certainty.

disturbance

Fixed Price per Wet Ton

Fixed annual rates indexed to real-world cost drivers.

business-contract

Feedstock Characteristics

Clear feedstock specifications ensure safe, efficient processing.

A Better Way to Handle Sludge

Comparing Orbital’s process to traditional sludge disposal methods.

CriteriaLand ApplicationLandfillingIncineration logo
Carbon Impactclosecloseclose checkCarbon-negative (<0 CO₂e)
Operational Reliabilitycloseclose checkcheckHigh uptime
Cost EffectiveOccasionallycloseclosecheck Predictable $/ton
PFAS DestructionclosecloseOccasionallycheck Complete destruction
Beneficial Reuse checkcloseclosecheck Biocarbon Product
Energy RecoverycloseOccasionally checkcheckRenewable thermal energy

Two models, Same Reliability

Choose the setup that fits your operations best—Orbital’s approach works whether you haul sludge to us or host the plant on your site.

Orbital builds and operates regional hubs that receive dewatered sludge from multiple utilities. Haulers deliver directly to Orbital; where the sludge is dried and carbonized into biocarbon.

Key Economic Benefits: Lower $/wet ton, zero capex—our shared hub spreads fixed costs and trims haul miles.

Highlights:

  • No utility capex: Orbital finances, owns and operates each facility.
  • Reduced hauling distance: Regional location lowers transport costs versus landfill/land application routes.
  • Stable service fees: Multi-year contracts prevent landfill price spikes.
  • Economies of scale: Shared infrastructure lowers cost per ton.
  • Guaranteed capacity: Reserved throughput under long-term agreements.
Regional-Facilities-photo-up

Orbital designs, builds, owns, and operates systems installed directly at your wastewater treatment plant. Your sludge is processed on site using the same reliable drying and carbonization system as our regional hubs.

Key Economic Benefits: Cut hauling to near-zero and lock in multi-year rates—the lowest total cost option for higher-volume plants.

Highlights:

  • Lowest lifetime disposal cost for high-volume plants.
  • No capital outlay: Orbital funds and operates the system under a service agreement.
  • Avoids outbound hauling fees and diesel exposure.
  • Integrated energy recovery reduces operating cost per ton.
  • Predictable pricing tied to your budget cycle.
Co-Located Facilities-Photo

Typical Project Timeline

From handshake to operations in ~15–18 months (site-dependent).

Month 0–1

Feasibility & Data

Sludge profile, site walk, preliminary model.

Month 2–4

Commercial Terms & LOI

Pricing framework, offtake, definitive agreements

Month 5

Notice to Proceed (NTP)

Design starts; long-lead items queued.

Month 6–16

Engineering, Procurement, Construction (EPC)

Detailed design, permitting, fabrication, build.

Month 16–18

Commissioning, Performance Test & COD

Ramp-up to commercial operations

Find Out If Orbital Is Right for You

We’ll review your sludge volumes, hauling routes and disposal costs to see if our services make sense—no obligation, just a straightforward discussion.

NOW OPEN  ·  Orbital Capacity Reservation Process — regional New England biosolids disposal capacity.